
Commercial EICR costs in the UK typically start from £149.99 for a single distribution board and scale according to the number of consumer units, total circuit count, and operational complexity—from small high-street shops to multi-floor offices and industrial units. Under the Electricity at Work Regulations 1989, employers, dutyholders, and commercial landlords must maintain electrical systems so they do not give rise to danger.
At Landlord Certificate London, our qualified engineers carry out commercial EICR inspections across Greater London with clear distribution-board pricing, out-of-hours scheduling, and comprehensive BS 7671 test schedules.

Field Insight from Hassan Sharif
Business Development Manager & Compliance Specialist at Landlord Certificate London
“When commercial tenants or managing agents request EICR quotes in London, the biggest pricing surprises almost always come from unlabelled three-phase distribution boards or hidden sub-mains serving basement plant rooms and mezzanine offices. Before we attend a restaurant in Soho or an office suite in Canary Wharf, we ask how many distribution boards are on site and whether circuits can be isolated during trading hours or need early-morning testing. That simple check prevents abortive visits and keeps your total compliance budget transparent from day one.”
What Is a Commercial EICR & Why Do Businesses Need One?
A commercial Electrical Installation Condition Report (EICR) is a detailed inspection and dead/live test of a workplace’s fixed electrical installation—covering three-phase distribution boards, sub-mains, ring circuits, lighting, earthing, and protective devices against IET Wiring Regulations (BS 7671).
Per HSE electrical safety guidance, regular inspection and testing demonstrates that your workplace electrics are safe for staff, customers, and contractors—supporting commercial property insurance validity, lease covenants, and fire risk assessments.

- ✓Small retail & studios: Typically £149.99–£300 for single consumer unit premises with straightforward lighting and power circuits.
- ✓Offices & hospitality: Generally £279.99–£600 depending on multiple distribution boards, server rooms, and commercial kitchen loads.
- ✓Industrial & warehouses: Often £600–£1,200+ due to three-phase machinery, high-bay lighting, and extensive circuit counts.
- ✓Recommended intervals: Every 5 years for offices/retail and every 3 years for industrial sites (or on change of occupancy).
Commercial EICR Pricing in London by Consumer Unit
Unlike residential properties priced by bedroom count, commercial premises vary wildly in electrical load. Landlord Certificate London prices commercial EICRs transparently by the number of distribution boards (consumer units) and total circuits:
| Distribution Board Scale | Fixed Base Price | Typical Commercial Premises |
|---|---|---|
| 1 Consumer Unit | £149.99 | Small retail shops, salons, cafés, compact offices |
| 2 Consumer Units | £279.99 | Medium offices, restaurants, dental or medical clinics |
| 3 Consumer Units | £418.99 | Multi-floor offices, larger hospitality venues, workshops |
| Additional Circuits (after 15) | £12 per circuit | Larger sub-boards, three-phase plant, warehouse bays |
Factors That Influence Commercial EICR Property Costs
Beyond distribution board count, several practical site conditions affect engineering hours and overall cost:
- ✓System age & labelling: Older installations with unlabelled circuits or missing previous test records take longer to trace safely.
- ✓Out-of-hours isolation: Businesses that cannot shut down servers, tills, or refrigeration during the day often require evening or weekend testing.
- ✓Location & access: Central London parking restrictions, Congestion Zones, or high-level warehouse access equipment can add to site costs.
- ✓Remedial repairs: Inadequate earthing, deteriorated wiring, or C1/C2 defects require separate quotation and sign-off after the inspection.
How Often Should a Commercial EICR Be Carried Out?
IET Guidance Note 3 sets recommended maximum inspection intervals according to building use, footfall, and environmental wear and tear:
| Business Sector | Recommended Interval | Key Risk Drivers |
|---|---|---|
| Offices & Retail Shops | Every 5 years (or change of occupancy) | High socket usage, display lighting, tenant alterations |
| Industrial & Warehouses | Every 3 years | Heavy machinery, vibration, dust, three-phase loads |
| Public Entertainment / Cinemas | Every 1–3 years | Public footfall, licensing authority conditions |
What Happens After a Commercial EICR & Common Issues
Once testing finishes, your engineer issues a full report with a schedule of inspections and test results. If any C1 (danger present), C2 (potentially dangerous), or FI (further investigation) codes are recorded—such as inadequate earthing and bonding, deteriorated insulation, or overloaded circuits—you should schedule remedial repairs promptly and retain written confirmation alongside your original EICR for insurers and HSE compliance.
Ready to book your commercial inspection? Schedule online below or call our London compliance team on 020 4518 8198 (or email info@landlordcertificatelondon.co.uk).
Frequently Asked Questions
+ Can I perform a commercial EICR myself?
No. A commercial EICR must be completed by a qualified and competent electrical engineer using calibrated test instruments to BS 7671 standards. Self-assessments are not accepted by commercial insurers, landlords, or HSE inspectors.
+ What happens if a commercial property fails its EICR?
An Unsatisfactory report will list C1, C2, or FI observations. C1 dangers must be made safe immediately, while C2 and FI issues should be rectified promptly by a qualified electrician and signed off with a Minor Works or Electrical Installation Certificate.
+ Does power have to be turned off during a commercial EICR?
Yes, temporary circuit isolation is required for dead testing. For offices, clinics, or retail stores with critical IT or refrigeration, engineers can test circuits one at a time or schedule out-of-hours visits to minimise disruption.
+ How can businesses reduce their commercial EICR cost?
Ensure all distribution boards and plant rooms are clearly labelled and accessible, keep previous EICR schedules on file, and fix obvious broken accessories before the engineer arrives to avoid extra tracing time.
About the Author: Hassan Sharif
Related Posts
Get Social
Recent Posts
- Asbestos Management Surveys for London Rental Properties: CAR 2012 Landlord Guide
- Commercial Fire Risk Assessment London: Workplace Fire Compliance & Safety Certification
- Commercial Gas Safety Certificate CP42 London: Commercial Kitchen & Catering Compliance
- Landlord Gas Safety Certificate CP12 London: Annual Inspection & Legal Compliance Guide
- Commercial EICR London: Business Electrical Testing & Workplace Compliance Guide













